The system provided a tough, crack resistant, cushioned floor, which helps to reduce the noise from wheeled traffic.

Project

Polydeck received an urgent request from Mace to produce a suitable floor finish for corridors and kerbs at GSK’s plant in Coleford.

Challenge and Solution

In order to meet a demanding schedule, Polydeck recommended the use of BASF Mastertop systems, which would meet the performance requirements of the floor and be achievable within the timescale and site constraints.

The existing surfaces were broken out and prepared, whilst maintaining a dust free environment. Fast cure screed was applied, which overlaid with BASF Mastertop 1324 thin section elastomeric polyurethane floor finish.

The system provided a tough, crack resistant, cushioned floor, which helps to reduce the noise from wheeled traffic.

The contract was completed within minimum disruption for the client, and fully met the client’s brief in terms of performance and aesthetics.

Download a PDF of this Case Study

High and low resolution versions are available. Click the relevant link below.

Call Us Today

+44 (0) 1249 463835

Speak to a member of our team today.

  • Head Office

    Polydeck Resins Ltd,
    Unit 5,
    Sheldon Business Park,
    Chippenham,
    Wiltshire,
    SN14 0SQ

    T: +44 (0) 1249 463835
    E: sales@polydeckresins.co.uk

  • London & South East

    Polydeck Resins Ltd,
    13 Devonshire Business Park,
    Cranborne Road,
    Potters Bar,
    London,
    EN6 3JR

    T: +44 (0) 1707 802062
    E: sales@polydeckresins.co.uk

  • Scotland Office

    Polydeck Resins Ltd

    T: +44 (0) 1414 337980
    E: sales@polydeckresins.co.uk

  • Midlands Office

    Polydeck Resins Ltd

    T: +44 (0) 1522 581493
    E: sales@polydeckresins.co.uk