“I am simply overwhelmed by your company’s performance and your relentlessness to succeed. […] the moral on site remains as its highest level and your guys continue to perform and enjoy the challenge. I would like to thank you and your team for knuckling down with us and succeeding where others would have failed.”

Project

Polydeck Group were appointed to carry out the ground works, stainless steel and resin for HCM on both Britvic jobs worth circa £4.5 million.

Challenge

Polydeck were engaged to complete two contracts within a fast track build. Both were extremely challenging in terms of resources and procurement and involved in excess of 60 men on site from Polydeck at any time.

Solution

Excavation and removal of concrete slabs, installing new slabs to falls and bespoke stainless drainage system followed by BASF HPQ resin system and DP10 respectively.

  • Leeds: 30 operatives on site for 9 weeks.
  • Beckton: 60 operatives on site for 28 weeks.

Download a PDF of this Case Study

High and low resolution versions are available. Click the relevant link below.

Call Us Today

+44 (0) 1249 463835

Speak to a member of our team today.

  • Head Office

    Polydeck Resins Ltd,
    Unit 5,
    Sheldon Business Park,
    Chippenham,
    Wiltshire,
    SN14 0SQ

    T: +44 (0) 1249 463835
    E: sales@polydeckresins.co.uk

  • London & South East

    Polydeck Resins Ltd,
    13 Devonshire Business Park,
    Cranborne Road,
    Potters Bar,
    London,
    EN6 3JR

    T: +44 (0) 1707 802062
    E: sales@polydeckresins.co.uk

  • Scotland Office

    Polydeck Resins Ltd

    T: +44 (0) 1414 337980
    E: sales@polydeckresins.co.uk

  • Midlands Office

    Polydeck Resins Ltd

    T: +44 (0) 1522 581493
    E: sales@polydeckresins.co.uk